Lincolnshire Fire & Rescue

Urban Search & Rescue
Home     USAR Team     Lincolnshire USAR Roles     Vehicles & Equipment     Gallery     Search Dogs     Waddington     Site Map     Green      
High Line Rescue
SWRT
Bob Cat
Hot Cutting

Lincolnshire USAR were requested to construct a simulated rail carraige within a tunnel, USAR's first role was to create access into the tunnel, this presented considerable difficulty because this was previously a land fill site and so we encounted a sheer slope approx 10M in height, which made vehicular access previously impossible, following a days work with BOB! a track was constructed to allow vehicular access to the tunnel entrance.

 

BOB worked to the best of it's abillity and was pushed to the limit - Daz & John C would like to thank BOB for it tenacity and belief in its self in times of doubt when both drivers thought otherwise!!!!

 

Rail Exercise
Pause Stop Previous Next View full-sized photos