Lincolnshire USAR were requested to construct a simulated rail carraige within a tunnel, USAR's first role was to create access into the tunnel, this presented considerable difficulty because this was previously a land fill site and so we encounted a sheer slope approx 10M in height, which made vehicular access previously impossible, following a days work with BOB! a track was constructed to allow vehicular access to the tunnel entrance.
BOB worked to the best of it's abillity and was pushed to the limit - Daz & John C would like to thank BOB for it tenacity and belief in its self in times of doubt when both drivers thought otherwise!!!!
Rail Exercise JavaScript must be enabled to view images.